logologo_light
  • Home
  • About Us
  • Areas of activity
    • Engineering
    • Boilers supply
    • Burners supplier
    • High power boiler rooms
    • Automation and control
    • Cold and hot air conditioning
    • Industrial cold
    • Technological renting
  • Services
    • Engineering
    • Maintenance and inspections
    • Repairs
    • Commissioning of facilities
    • Revamping
  • Products
    • Industrial burners
    • Boilers
    • SICAPH combustion air preheaters
    • Second-hand Boilers and Burners
    • Spare parts
  • Saving and quality
  • References
  • News
  • Contact
  • Español
  • English
+34 944 53 03 61
info@solucionesdecombustion.com
logologo_light
  • Home
  • About Us
  • Areas of activity
    • Engineering
    • Boilers supply
    • Burners supplier
    • High power boiler rooms
    • Automation and control
    • Cold and hot air conditioning
    • Industrial cold
    • Technological renting
  • Services
    • Engineering
    • Maintenance and inspections
    • Repairs
    • Commissioning of facilities
    • Revamping
  • Products
    • Industrial burners
    • Boilers
    • SICAPH combustion air preheaters
    • Second-hand Boilers and Burners
    • Spare parts
  • Saving and quality
  • References
  • News
  • Contact
Search
Section
  • Biogás
  • Mantenimiento de equipos de combustion
  • News
  • Proyectos térmicos y de combustión
  • Services
  • Technology
Archive

Manufacturing process of a boiler for the pharmaceutical industry

Soluciones Integrales de Combustión XXI (Integral Combustion Solutions) carries out the manufacturing process of a boiler for the pharmaceutical industry. In the current phase, the company has carried out the hydraulic pressure test at 61 bar, which has been correct. The new double-drum water-tube boiler will have a capacity of 10 tons per hour at […]
  • On 13/07/2020
  • Read More

Change of indirect supervision period in the boiler of a paper mill

Integral Combustion Solutions (Soluciones Integrales de Combustion) has culminated the change in the indirect supervision period from 2 H to 24 H in the boiler of a paper mill, as well as the change in the electrical panel of the installation.

  • On 03/07/2020
  • Read More

    SICAPH AIR PREHEATERS IMPROVE ENERGY EFFICIENCY IN STEAM AND THERMAL INSTALLATIONS

    Soluciones Integrales de Combustión (Integral Combustion Solutions), company with activities of design, manufacturing, installation, maintenance and repair of equipment and systems for thermal installations and steam systems in industry, has launched SICAPH combustion air preheaters (APH), designed to improve environmental, technical and economic performance.
    • On 02/06/2020
    • Read More

    Commissioning of industrial boilers for the paper industry

    Soluciones Integrales de Combustión (Comprehensive Combustion Solutions), a company specialized in the commissioning of industrial boilers, as well as the maintenance and revamping of energy installations, has completed the installation of the Steam Generator Equipment in a Smurfit Kappa paper plant in the town of Burgos. This factory concentrates its technological activity on the manufacture […]
    • On 26/05/2020
    • Read More

    THE MOST EXCLUSIVE IMAGES OF THE ASHALIM SOLAR THERMAL POWER STATION

    Integral Combustion Solutions XXI offers the most exclusive images of the Ashalim Solar Thermal Power station, which has a power of 125 MW. (more…)

    • On 22/05/2020
    • Read More
    Page 21 of 26«‹1920212223›»
    Scroll

    Support 27/4

    Soluciones Integrales de Combustión (Integral Combustion Solutions) provides "turnkey" services for thermal and combustion installations: engineering and supply, installation, start-up, maintenance and repair.
    Our goal is to achieve maximum efficiency for our customers facilities by saving energy and improving the environment.
    + Info

    News
    • Steam system for corrugated cardboard production - Soluciones Integrales de CombustiónInstallation of a steam system for corrugated cardboard production in Valencia
    • Pistachio drying facility - Soluciones Integrales de CombustiónPistachio drying facility in Ciudad Real
    • Maintenance and commissioning of the Quantum Energía III combined-cycle plant - SICMaintenance and commissioning of the Quantum Energía III combined-cycle plant
    [ +News ]

    Location



    Central Office:
    Plaza de la Constitución, 2-2-1º
    28529 Rivas-Vaciamadrid
    (Madrid)
    +34 91 139 50 79


    Basque Country:
    +34 944 53 03 61
    Certifiado medioambiente iso1400Certificado calidad iso900
    © 2017-2026 Soluciones Integrales de Combustión - Legal Disclaimer · Cookies Policy · A develop of Pool de Comunicación and VCD
    • Home
    • Services
    • Contact