logologo_light
  • Home
  • About Us
  • Areas of activity
    • Engineering
    • Boilers supply
    • Burners supplier
    • High power boiler rooms
    • Automation and control
    • Cold and hot air conditioning
    • Industrial cold
    • Technological renting
  • Services
    • Engineering
    • Maintenance and inspections
    • Repairs
    • Commissioning of facilities
    • Revamping
  • Products
    • Industrial burners
    • Boilers
    • SICAPH combustion air preheaters
    • Second-hand Boilers and Burners
    • Spare parts
  • Saving and quality
  • References
  • News
  • Contact
  • Español
  • English
+34 944 53 03 61
info@solucionesdecombustion.com
logologo_light
  • Home
  • About Us
  • Areas of activity
    • Engineering
    • Boilers supply
    • Burners supplier
    • High power boiler rooms
    • Automation and control
    • Cold and hot air conditioning
    • Industrial cold
    • Technological renting
  • Services
    • Engineering
    • Maintenance and inspections
    • Repairs
    • Commissioning of facilities
    • Revamping
  • Products
    • Industrial burners
    • Boilers
    • SICAPH combustion air preheaters
    • Second-hand Boilers and Burners
    • Spare parts
  • Saving and quality
  • References
  • News
  • Contact

Change of indirect supervision period in the boiler of a paper mill

Integral Combustion Solutions (Soluciones Integrales de Combustion) has culminated the change in the indirect supervision period from 2 H to 24 H in the boiler of a paper mill, as well as the change in the electrical panel of the installation.

The modification of the shutdown protocol has led to the improvement of the factory’s industrial security, as well as the extension of the frequency period for indirect supervision of the plant. 

It is a sensitive job from the point of view of electronics and instrumentation, which requires technical skills. In fact, in the case of pressure equipment, the regulation requires an adaptation project prepared by a competent technician.  

Change of indirect supervision period in the boiler of a paper mill - Integral Combustion Solutions

Change of indirect supervision period in boilers

 The regulation of pressure equipment in force in Spain (RD 2060/2008), in its fifth transitory provision, authorizes existing boilers to adapt their surveillance system to the systems indicated in article 7 of the official technical instruction, the ITC EP -1, demanding the presentation of a technical adaptation project. 

The transition to indirect supervision from periods of up to 2 hours to periods of up to 24 hours or 72 hours is possible thanks to the installation of highly reliable electronic elements that allow greater control over the operating conditions of boilers and boiler rooms. 

Our philosophy is to move towards a boiler management system (BMS) that reduces the number of limiters and controllers to be used, giving greater flexibility to the boiler operator. Following this philosophy, Integral Combustion  Solutions (Soluciones Integrales de Combustión) has carried out numerous adaptation projects 24 hours and 72 hours with total satisfaction of our clients. 

Integral Combustion Solutions

Integral Combustion Solutions offers “turnkey” services for energy installations, with global assistance anywhere in the world. From the engineering to supply, installation, instrumentation and control, maintenance, commissioning and repair phases. Our goal is to achieve maximum efficiency: saving energy and improving the environment.  

Comparte / Share :
  • On 03/07/2020
Tags: Cambio de seguridades, Cambio de supervisión indirecta, Change of indirect security, Change of securities, Instrumentation and control
Search
Section
  • Biogás
  • Mantenimiento de equipos de combustion
  • News
  • Proyectos térmicos y de combustión
  • Services
  • Technology
Archive

SICAPH AIR PREHEATERS IMPROVE ENERGY EFFICIENCY IN STEAM AND THERMAL INSTALLATIONS

Previous thumb

Manufacturing process of a boiler for the pharmaceutical industry

Next thumb
Scroll

Support 27/4

Soluciones Integrales de Combustión (Integral Combustion Solutions) provides "turnkey" services for thermal and combustion installations: engineering and supply, installation, start-up, maintenance and repair.
Our goal is to achieve maximum efficiency for our customers facilities by saving energy and improving the environment.
+ Info

News
  • Steam system for corrugated cardboard production - Soluciones Integrales de CombustiónInstallation of a steam system for corrugated cardboard production in Valencia
  • Pistachio drying facility - Soluciones Integrales de CombustiónPistachio drying facility in Ciudad Real
  • Maintenance and commissioning of the Quantum Energía III combined-cycle plant - SICMaintenance and commissioning of the Quantum Energía III combined-cycle plant
[ +News ]

Location



Central Office:
Plaza de la Constitución, 2-2-1º
28529 Rivas-Vaciamadrid
(Madrid)
+34 91 139 50 79


Basque Country:
+34 944 53 03 61
Certifiado medioambiente iso1400Certificado calidad iso900
© 2017-2026 Soluciones Integrales de Combustión - Legal Disclaimer · Cookies Policy · A develop of Pool de Comunicación and VCD
  • Home
  • Services
  • Contact