Supply of a turnkey Steam Boiler for a hospital in Cáceres
Integral Combustion Solutions XXI (Soluciones Integrales de Combustion) has made the supply of a turnkey Steam Boiler with a production of 860 kg for a hospital in Cáceres.
The turnkey project of the steam boiler, carried out with its client Anymed Instalaciones, a company specialized in the commissioning and maintenance of air conditioning installations, consists of all the accessories. That includes the purge tank, the purge expansion tank and the entire supply pipe of steam to the hospital sterilization room.
Integral Combustion Solutions supplies two-step steam boilers, from 250 Kg / h to 5,500 Kg / h, with pressures ranging up to 16 bar, and three-step steam boilers, from 1 ton / hour to 30 tons / hour, with pressures that range from 4 to 16 bar. The equipment has low levels of NOx and perfect combustion thanks to the low thermal load of the combustion chamber. The boiler’s performance can reach up to 91% and up to 95% with economizer.
Integral Combustion Solutions is an Installer and Energy Services company that specializes in the supply, installation, maintenance and repair of ALL the elements that make up a Thermal Power Plant. It is made up of professionals from the sector with more than 20 years of experience.
The hallmark of the company is to provide a comprehensive service. Its goal is to ensure that our customers do not have to worry about their facilities.
- On 26/09/2019