logologo_light
  • Home
  • About Us
  • Areas of activity
    • Engineering
    • Boilers supply
    • Burners supplier
    • High power boiler rooms
    • Automation and control
    • Cold and hot air conditioning
    • Industrial cold
    • Technological renting
  • Services
    • Engineering
    • Maintenance and inspections
    • Repairs
    • Commissioning of facilities
    • Revamping
  • Products
    • Industrial burners
    • Boilers
    • SICAPH combustion air preheaters
    • Second-hand Boilers and Burners
    • Spare parts
  • Saving and quality
  • References
  • News
  • Contact
  • Español
  • English
+34 944 53 03 61
info@solucionesdecombustion.com
logologo_light
  • Home
  • About Us
  • Areas of activity
    • Engineering
    • Boilers supply
    • Burners supplier
    • High power boiler rooms
    • Automation and control
    • Cold and hot air conditioning
    • Industrial cold
    • Technological renting
  • Services
    • Engineering
    • Maintenance and inspections
    • Repairs
    • Commissioning of facilities
    • Revamping
  • Products
    • Industrial burners
    • Boilers
    • SICAPH combustion air preheaters
    • Second-hand Boilers and Burners
    • Spare parts
  • Saving and quality
  • References
  • News
  • Contact

Smurfit Portugal increases the performance of its boiler with a preheater

Integral Combustion Solutions has managed to increase the performance of the Smurfit Kappa Celpack boiler in Porto, Portugal, with the start-up of a preheater. This preheater has allowed boiler thermal efficiency to be increased by about three points, from 90% throughput to 93%.

Preheater for increasing the boiler performance | Combustion Solutions

The boiler mentioned is a steam equipment with a production of 6,000 kg. of steam at a working pressure of 15 bar. The temperature of air entering the burner goes from about 30 degrees of boiler room temperature up to 115 degrees, once passed through the exchanger. Air preheaters (APH) reduce fuel consumption in boilers by recovering heat from exhaust gases and can be used with all types of fuel.

Smurfit Kappa Celpack plant is integrated into the Smurfit Kappa Spain and Portugal division, a geographical area composed of 19 centers dedicated to the manufacture of packaging solutions for corrugated cardboard, paper for packaging and forest management. In the plant near Porto, it designs and manufactures sustainable and innovative packaging systems in association with its customers to respond to the needs of the food and beverage, pharmaceutical, as well as industrial and electronic products, among others.

Integral Combustion Solutions provides turnkey services for energy installations, with the aim of improving productivity and improving the energy efficiency of its customers. The company provides Energy Services such as the supply, installation, maintenance and repair of all the elements that make up a Thermal Power Plant.

 

Comparte / Share :
  • On 27/12/2019
Tags: Combustion Solutions, Eficiencia energética, Energy efficiency, Precalentadores, Preheaters, soluciones de combustion
Search
Section
  • Biogás
  • Mantenimiento de equipos de combustion
  • News
  • Proyectos térmicos y de combustión
  • Services
  • Technology
Archive

Boiler room cleaning with sound

Previous thumb

Heating installation in a greenhouse in Uzbekistan

Next thumb
Scroll

Support 27/4

Soluciones Integrales de Combustión (Integral Combustion Solutions) provides "turnkey" services for thermal and combustion installations: engineering and supply, installation, start-up, maintenance and repair.
Our goal is to achieve maximum efficiency for our customers facilities by saving energy and improving the environment.
+ Info

News
  • Steam system for corrugated cardboard production - Soluciones Integrales de CombustiónInstallation of a steam system for corrugated cardboard production in Valencia
  • Pistachio drying facility - Soluciones Integrales de CombustiónPistachio drying facility in Ciudad Real
  • Maintenance and commissioning of the Quantum Energía III combined-cycle plant - SICMaintenance and commissioning of the Quantum Energía III combined-cycle plant
[ +News ]

Location



Central Office:
Plaza de la Constitución, 2-2-1º
28529 Rivas-Vaciamadrid
(Madrid)
+34 91 139 50 79


Basque Country:
+34 944 53 03 61
Certifiado medioambiente iso1400Certificado calidad iso900
© 2017-2026 Soluciones Integrales de Combustión - Legal Disclaimer · Cookies Policy · A develop of Pool de Comunicación and VCD
  • Home
  • Services
  • Contact